top of page

劉修銘

Liu-Siou Ming

Senior Engineer

Facility UPW Section, Winbond Electronics Corp.

Education

IMG_9645_copy[1].jpg
    · Master in Environmental Engineering
    · Chia Nan University of Pharmacy & ScienceUniversity

Experience

· Winbond Electronics September 2022 ~ Present
· Cyntec Co. September 2021 ~ September2022
· AU Optronics April 2015 ~ September 2021

Speech Title and Abstract

Heat Recovery- Introduce Heat Pump Equipment to Hot UPW to achieve Energy Recycle

For semiconductor producing processes, some procedures need hot UPW to clean the wafers.
Generally there are two ways to generate hot UPW: Central Hot UPW supply system ; Local DI heater.
For Winbond, we adapt Central Hot UPW supply system and this is the first time we introduce heat pump equipment to Hot DI System.
By Heat Pump equipment , we can reduce the natural gas usage and cooling system energy usage at the same time and save huge carbon emission.
Using operational data from the Hot UPW system to create key performance indicators (KPIs) for for adjusting machines to reduce energy consumption.

bottom of page